New Home Construction in Brisbane

What are the stages of building a new home in Brisbane?

Five stages, and each one has a fixed set of steps behind it. We visit your block and give you a concept plan and an estimate. You sign a preliminary agreement and we produce working drawings. You go through your inclusions and selections. We issue a tender contract priced on those selections. Then we build, and you get handover on a date we committed to.

Behind those five stages sit 47 detailed systems and around 500 individual tasks. That is not a slogan. It is the reason your build does not depend on somebody remembering something.

new-home-construction-brisbane-1
new-home-construction-brisbane-2

How long does it take from signing to handover?

[CONFIRM: approval range] weeks for council approval, then [CONFIRM: construction range] weeks of construction, so [CONFIRM: total] from signed contract to handover on a typical build. You get a real date range at concept stage rather than a best case, and if something moves you hear it from us before you have to ask.

Where new builds go wrong, and how we stop it

Most build horror stories come from the same three places. A price built on allowances that were always going to move. A design nobody engineered properly before it was quoted. And a builder carrying too many jobs to notice a problem early.

We price on your actual selections rather than allowances, we draw and engineer before we quote because we design and build in the same company, and we take on a limited number of homes each year. Jay came up as an apprentice watching everything live in one person’s head, and built the systems so it never does here.

new-home-construction-brisbane-3
new-home-construction-brisbane-2

Why homeowners across Brisbane build with us

  • QBCC licence number 15156763. Member of the Master Builders Association.
  • A seven year structural guarantee on our workmanship.
  • We take on a limited number of homes each year, [CONFIRM: number], so Jay is across your job rather than one of hundreds.
  • If you do not love your concept plan we redesign it at no charge and take $1,000 off your contract.
  • [CONFIRM: one completed project we can name near Brisbane, with the suburb stated.]
About Page_Jay replace

Written by Jay Mostyn, founder and director of Luxury Lifestyle Homes. Jay is a qualified carpenter QBCC licence number 15156763 with 20+ years building custom homes across Brisbane and the Moreton Bay region.

Frequently Asked Questions

How long does it take to build a new home in Brisbane?

[CONFIRM: approval range] weeks for council approval and [CONFIRM: construction range] weeks of construction, so roughly [CONFIRM: total] from signed contract to handover. Acreage and sloping blocks usually add time at the approval stage because of overlays and wastewater applications, and we build that into the programme up front.

What is the first step in building a new home?
How do I stop my build going over budget?
Do you handle council approvals?

We are a revered builder, helping Brisbane homeowners with the construction of quality new homes. Contact us today.

Scroll to Top
Call Now Button